05.06.2024 | Infraestrutura
The dredging of Imetame Logística Porto is heading towards reaching a depth of 17 meters in the darsena area. Currently having 2.434.000m³ dredged, which represents 76% of physical progress (stage 1).
The main equipment for this activity is the “Backhoe” model dredger, which is in full operation for the evolution and success of this stage. This service is expected to be completed in the second half of the year.